Diffa Imelya Rachmani Hasan, 2021810019 and Yumna Salma Nabilah, 2021810039 (2021) Analisis Manajemen Risiko Penanganan Bahan Baku Di Proyek Pembangunan Jalan Tol Solo-Jogja Paket 1.1 PT. Adhi Karya (Persero)Tbk. [Laporan Kerja Praktik/Magang] (Unpublished)
Text (KERJA PRAKTIK - PT. ADHI KARYA (PERSERO) Tbk)
KERJA PRAKTIK - (DIFFA IMELYA RACHMANI HASAN, 2021810019) & (YUMNA SALMA NABILAH, 2021810039).pdf Download (2MB) |
|
Text (KERJA PRAKTIK - PT. ADHI KARYA (PERSERO) Tbk)
KERJA PRAKTIK - (DIFFA IMELYA RACHMANI HASAN, 2021810019) & (YUMNA SALMA NABILAH, 2021810039).docx Download (5MB) |
Item Type: | Laporan Kerja Praktik/Magang | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | Department of Logistic Engineering | ||||||
Depositing User: | Yumna Salma Nabilah | ||||||
Date Deposited: | 11 Mar 2022 12:50 | ||||||
Last Modified: | 11 Mar 2022 12:50 | ||||||
URI: | https://repository.uisi.ac.id/id/eprint/3228 |
Actions (login required)
View Item |