Fitri Nur Asih Wijayanti, 2011910026 and Nur Izza Laila, 2011910020 (2023) PERANCANGAN KURSI OPERATOR FIX GRAB UNIT (FGU) PT. PETROKIMIA GRESIK DENGAN PENDEKATAN ANTROPOMETRI. [Laporan Kerja Praktik/Magang] (Unpublished)
Text (KERJA PRAKTIK - PT. PETROKIMIA GRESIK)
KERJA PRAKTIK - (FITRI NUR ASIH WIJAYANTI, 201190026) & (NUR IZZA LAILA, 2011910020).pdf Download (1MB) |
|
Text (KERJA PRAKTIK - PT. PETROKIMIA GRESIK)
KERJA PRAKTIK - (FITRI NUR ASIH WIJAYANTI, 201190026) & (NUR IZZA LAILA, 2011910020).docx Restricted to Repository staff only Download (8MB) | Request a copy |
Item Type: | Laporan Kerja Praktik/Magang | ||||||
---|---|---|---|---|---|---|---|
Additional Information: | Soft File | ||||||
Contributors: |
|
||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | Department of Engineering Management | ||||||
Depositing User: | Fitri Nur Asih Wijayanti | ||||||
Date Deposited: | 24 Jan 2023 15:31 | ||||||
Last Modified: | 24 Jan 2023 15:31 | ||||||
URI: | https://repository.uisi.ac.id/id/eprint/4322 |
Actions (login required)
View Item |