PROSEDUR PENERAPAN REDPACK TOL LAUT PT PELNI CABANG SURABAYA

Hermalia Sheila Andini, 2021910020 and Umi Latifah, 2021910047 (2023) PROSEDUR PENERAPAN REDPACK TOL LAUT PT PELNI CABANG SURABAYA. [Laporan Kerja Praktik/Magang] (Unpublished)

This is the latest version of this item.

[img] Text (KERJA PRAKTIK - PT PELNI (PERSERO) Tbk SURABAYA)
KERJA PRAKTIK - (Hermalia Sheila Andini, 2021910020) & (Umi Latifah, 2021910047).docx
Restricted to Repository staff only

Download (10MB) | Request a copy
[img] Text (KERJA PRAKTIK - PT PELNI (PERSERO) Tbk SURABAYA)
KERJA PRAKTIK - (Hermalia Sheila Andini, 2021910020) & (Umi Latifah, 2021910047).pdf

Download (4MB)
Item Type: Laporan Kerja Praktik/Magang
Contributors:
ContributionNameEmail
MonitorMaulin Masyito Putri, .S.T.,M.Tmaulin.putri@uisi.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Department of Logistic Engineering
Depositing User: Hermalia Sheila Andini
Date Deposited: 01 Feb 2023 10:52
Last Modified: 01 Feb 2023 10:52
URI: https://repository.uisi.ac.id/id/eprint/4427

Available Versions of this Item

  • PROSEDUR PENERAPAN REDPACK TOL LAUT PT PELNI CABANG SURABAYA. (deposited 01 Feb 2023 10:52) [Currently Displayed]

Actions (login required)

View Item View Item