Aldy Pratama Mulyadi, 2021910006 and Muhammad Nabil Abdullah, 2021910030 (2023) ANALISIS PENYEBAB KETERLAMBATAN BONGKAR MUAT BARANG AKIBAT FAKTOR PERALATAN KAPAL PELNI CABANG SURABAYA (STUDI KASUS: KM SINABUNG). [Laporan Kerja Praktik/Magang] (Unpublished)
Text (KERJA PRAKTIK - PT PELNI (Persero) Tbk, CABANG SURABAYA)
LAPORAN KERJA PRAKTIK - (ALDY PRATAMA MULYADI, 2021910006) & (MUHAMMAD NABIL ABDULLAH, 2021910030).pdf Download (3MB) |
|
Text (KERJA PRAKTIK - PT PELNI (Persero) Tbk, CABANG SURABAYA)
LAPORAN KERJA PRAKTIK - (ALDY PRATAMA MULYADI, 2021910006) & (MUHAMMAD NABIL ABDULLAH, 2021910030).docx Restricted to Repository staff only Download (6MB) | Request a copy |
Item Type: | Laporan Kerja Praktik/Magang | ||||||
---|---|---|---|---|---|---|---|
Additional Information: | Soft File | ||||||
Contributors: |
|
||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | Department of Logistic Engineering | ||||||
Depositing User: | Aldy Pratama Mulyadi | ||||||
Date Deposited: | 09 Feb 2023 09:42 | ||||||
Last Modified: | 09 Feb 2023 09:42 | ||||||
URI: | https://repository.uisi.ac.id/id/eprint/4573 |
Actions (login required)
View Item |