Ni'Matuz Zurro, 2022010026 and Sandra Ravi Erdiansyah, 2022010035 (2024) KERJA PRAKTIK - PENGOPTIMALAN WAKTU DISTRIBUSI CLINKER DARI PLAN SBI KE JETTY UNTUK MEMINIMALKAN LOADING RATE PADA PT. SOLUSI BANGUN INDONESIA TBK, TUBAN. [Laporan Kerja Praktik/Magang] (Unpublished)
Text (KERJA PRAKTIK - PT. SOLUSI BANGUN INDONESIA TBK, TUBAN)
KERJA PRAKTIK - N'Matuz Zurro,2022010026 - Sandra Ravi Erdiansyah, 2022010035.pdf Download (4MB) |
|
Text (KERJA PRAKTIK - PT. SOLUSI BANGUN INDONESIA TBK, TUBAN)
KERJA PRAKTIK - N'Matuz Zurro,2022010026 - Sandra Ravi Erdiansyah, 2022010035.docx Restricted to Repository staff only Download (13MB) | Request a copy |
Item Type: | Laporan Kerja Praktik/Magang | ||||||
---|---|---|---|---|---|---|---|
Additional Information: | Softfile/KK.24/UISI-02/TL | ||||||
Contributors: |
|
||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | Department of Logistic Engineering | ||||||
Depositing User: | Ni'Matuz Zurro | ||||||
Date Deposited: | 24 Jan 2024 11:17 | ||||||
Last Modified: | 14 Aug 2024 11:01 | ||||||
URI: | https://repository.uisi.ac.id/id/eprint/5904 |