Nur Farikhah, 2022010042 (2024) Usulan Penerapan Collaborative Planning, Forecasting and Replenishment dengan Metode Time Series Decomposition pada Material Clay Putih di PT Petrokimia Gresik. [Laporan Kerja Praktik/Magang] (Unpublished)
|
Text (KERJA PRAKTIK-PT.PETROKIMIA GRESIK)
MAGANG-(NUR FARIKHAH,2022010042).docx Restricted to Repository staff only Download (10MB) | Request a copy |
|
|
Text (KERJA PRAKTIK-PT.PETROKIMIA GRESIK)
MAGANG-(NUR FARIKHAH,2022010042).pdf Download (2MB) |
| Item Type: | Laporan Kerja Praktik/Magang | ||||||
|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
| Divisions: | Department of Logistic Engineering | ||||||
| Depositing User: | Nur Farikhah | ||||||
| Date Deposited: | 25 Jan 2024 10:52 | ||||||
| Last Modified: | 25 Jan 2024 10:52 | ||||||
| URI: | https://repository.uisi.ac.id/id/eprint/5918 |
Actions (login required)
![]() |
View Item |
