ANNISA FATHONI, 2022110004 (2025) Mitigasi Risiko Kerusakan dan Penurunan Kualitas Dalam Pengiriman Klinker di PT. Semen Indonesia Logistik Tuban Menggunakan Metode House Of Risk (HOR). [Laporan Kerja Praktik/Magang] (Unpublished)
Text (PT. SEMEN INDONESIA LOGISTIK TUBAN)
KERJA PRAKTIK – (ANNISA FATHONI, 2022110004).pdf Restricted to Registered users only Download (2MB) | Request a copy |
|
Text (PT. SEMEN INDONESIA LOGISTIK TUBAN)
KERJA PRAKTIK – (ANNISA FATHONI, 2022110004).docx Restricted to Repository staff only Download (9MB) | Request a copy |
Item Type: | Laporan Kerja Praktik/Magang | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | Department of Logistic Engineering | ||||||
Depositing User: | ANNISA FATHONI | ||||||
Date Deposited: | 23 Jan 2025 10:53 | ||||||
Last Modified: | 23 Jan 2025 10:53 | ||||||
URI: | https://repository.uisi.ac.id/id/eprint/7190 |
Actions (login required)
View Item |