Natasha Putri Adetya, 2022010025 and Nindya Putri Prasodjo, 2022010027 (2023) ANALISIS SISTEM CROSS-DOCKING UNTUK MEMINIMALKAN BIAYA MATERIAL HANDLING (STUDI KASUS PADA PT PERTAMINA EP CEPU REGIONAL 4 ZONA 11 FIELD POLENG). [Laporan Kerja Praktik/Magang] (Unpublished)
Text (KERJA PRAKTIK - PT PERTAMINA EP CEPU REGIONAL 4 ZONA 11 FIELD POLENG)
KERJA PRAKTIK – (NATASHA PUTRI ADETYA, 2022010025) &(NINDYA PUTRI PRASODJO, 2022010027).pdf Download (5MB) |
|
Text (KERJA PRAKTIK - PT PERTAMINA EP CEPU REGIONAL 4 ZONA 11 FIELD POLENG)
KERJA PRAKTIK – (NATASHA PUTRI ADETYA, 2022010025) &(NINDYA PUTRI PRASODJO, 2022010027).docx Restricted to Repository staff only Download (7MB) | Request a copy |
Item Type: | Laporan Kerja Praktik/Magang | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | Department of Logistic Engineering | ||||||
Depositing User: | Natasha Putri Adetya | ||||||
Date Deposited: | 15 Jan 2024 16:36 | ||||||
Last Modified: | 15 Jan 2024 16:36 | ||||||
URI: | https://repository.uisi.ac.id/id/eprint/5851 |
Actions (login required)
View Item |